Thousands of Nubian archeological sites will be flooded by a dam that the Sudanese government is building at the Nile's Fourth Cataract. When the Chinese-backed hydro-electricity project is finished in mid-2008, it will create a lake 170 kilometres long and up to four kilometres wide. Much of the Nubian heartland will lie at the bottom.
Links
[1] https://www.pambazuka.org/author/contributor
[2] https://www.pambazuka.org/taxonomy/term/3298
[3] https://www.pambazuka.org/article-issue/270
[4] https://www.pambazuka.org/taxonomy/term/3288
[5] http://www.pambazuka.org/en/category.php/environment/37152